S.NoProject NameQuantity (Sq.m of Facia Wall)Name of ContractorClientSystem SupplierScope of Work (Design,Supply ,Supervision)Scope of Work (Casting, Shifting , Levelling Pad, Coping & Erection)
1Development of 6 lane Acesses Controlled highway of DaatKaali Tunnel -Dehradun of ganeshpur-Dehradun section of NH-72A from Km 16+380 to Km 19+385 in the state of Uttrakhand under Bharatmala Pariyojna on EPC Mode-Pkg 320000M/s KRC Infraprojects Pvt LtdNHAIGeostormYY
2Construction of 6-lane NH-344 M- UER-II( from Karala-Kanjhawala Road Km 15.00 to Nangloi Najafgarh Road Km 28.450 ) in the state of Delhi on EPC Mode.40000M/s Krishna Constelleation Pvt LtdNHAIGeostormYY
3Construction of 2 lane with paved shoulders from Km 80+800 to Km 120+125 (Satna-Maihar Section) of NH-135 BG under Bharatmala Pariyojna in the state of MP on EPC Mode40000M/s GRTCPL-AIPL(JV)NHAIGeostormYY
4Rehabilitation & Upgradation of existing 2-lane to 4-Lane standards from Duburi- Chandikhol section of NH200(New NH 53) in the state of Odisha on EPC25000MS Infra Engineers Pvt LtdNHAIGeostormYY
5Construction of Reinforced Earth Retaining Walls (Panel with Geostrip) for 4/6 laning of NH5(new NH16) from Puntola to Tangi (from Km 284 to km 355 in the state of Odisha on EPC Mode.40000M/s CP Arora Engineers-contractors Pvt LtdNHAIGeostormYY
6Construction of Reinforced Earth Retaining Walls (Panel with Geostrip) for Rehabilitation and Upgradation of Hiran Rivar to Sindoor River section of NH 12 from Km 66.00 to Km 130.00 to 4 lane with paved shoulder in the state of Madhya Pradesh.45000M/s Krishna ConstructionsNHAIGeostormY
7Construction of carriage Way fron 2 lane to 4 lane of ghatipada-Sinapalli Road from 52+000 to 104+650( 2lane to 4 lane =50.650 km & 4 lane=2.0 Km) including 5 major bridges in the district of Nuapada(Pkg 4.2) under EPC Contract20000M/s RKD Construction Pvt LtdEE-Khariar, odishaGeostormYY
8Construction of Reinforced Earth Retaining Walls(Panel with Geogrid) for balance works for 4 laning of Ranchi Bypass Section of NH33 from Km 113.730 to Km 140.000 in state of Jharkhand Under NHDP III on EPC(Item Rate) mode.96527M/s RKSCPL/Shrikant SinghNHAIGeostormY
9Construction of Reinforced Earth Retaining Walls(Panel with Geogrid) for balance works for 4 laning of Rargaon-Jamshedpur Section of NH33 from Km 217.300 to Km 233.350 in state of Jharkhand Under NHDP III on EPC(Item Rate) mode.3800M/s RKSCPL/Shrikant SinghNHAIGeostormY
10Construction of Reinforced Earth Retaining Walls(Panel with Geogrid) for balance works for 2 lane with paved shoulder of PIPRAKOTHI-MOTIHARI-RAUXAUL section of NH 28A from Km 0.650 to Km 62.064 in state of BIHAR Under NHDP III.54000M/s RKSCPL/Shrikant SinghNHAIGeostormY
11Construction of Reinforced Earth Retaining Walls (Panel with Geostrip) for Construction of ROB at Rajupra on section of railway line between Rajpura-Bhatinda section, distt. Patiala,Punjab4000M/s S S BuildersPunjab PWD(B&R)GeostormY
12Construction of Reinforced Earth Retaining Walls (Panel with Geostrip) for Construction of ROB on Delhi-Ambala Railway Line at LC no 61 at Railway Km 99/21-23 crossing Kond Munak Salwan Assandh Road (MDR-114) at Km 1.000 in Distt. Karnal (Haryana)3500M/s S S BuildersHaryana PWD(B&R)GeostormY
13Construction of Reinforced Earth Retaining Walls (Panel with Geogrid) for Double Decker FO project in Chhapra town in the state of Bihar.10000M/s NCC ltdBRPNLAlliance InfratechYY
14Construction of Reinforced Earth Retaining Walls (Panel with Geostrip) for ROB at betiah town in the state of Bihar.10000M/s Super AdyarajEastern railwayAlliance InfratechYY
TOTAL SQ.M411827